3 Ton vs 5 Ton Spider Crane: Where Extra Capacity Stops Paying

3 Ton vs 5 Ton Spider Crane: Where Extra Capacity Stops Paying

risenmega |

3 Ton vs 5 Ton Spider Crane: Where Extra Capacity Stops Paying
Spider crane buyer's guide · Capacity and reach

A 5 ton spider crane lifts 2,000 kg more than a 3 ton. At 3 metres, it's 200 kg.

We read both load charts radius by radius, and the gap between the RM3.0 and the RM5.0 turns out to be far smaller close in than the model names suggest. Whether the extra tonnage pays depends on where your work sits, and how much steel you're willing to move to get it there.

5,000kg rated, fully retracted, RM5.0. The 3 ton gives 3,000
+200kg at a 3 m radius: 2,000 against 1,800
2.5×machine weight: 6,800 kg against 2,700 kg
16 mlift height on the 5 ton, against 10 m
Quick answer

Close in, the two machines are closer than their names. At a 3 m radius the RM5.0 is rated for 2,000 kg and the RM3.0 for 1,800 kg; the 2,000 kg nameplate gap becomes 200 kg. From 5 m outward the 5 ton pulls away: 2,200 kg against 1,000 kg at 5 m, and 1,200 kg against 500 kg at 7 m. Buy the 3 ton if your lifts sit within about 4 m and stay under roughly 1.8 t, and if the route in is a standard door: it's 955 mm wide and 2,700 kg. Buy the 5 ton for 1,200–2,200 kg loads at 5 to 7 m, or any lift needing more than 10 m of hook height. It's 1,400 mm wide and 6,800 kg, so it needs a goods entrance and a floor that can take it.

What "3 ton" and "5 ton" actually refer to

Before the charts

A spider crane's tonnage class is not the machine's own weight. It's the most it can lift with the boom fully retracted. Both machines here weigh more than their names: the 3 ton RM3.0 is 2,700 kg and the 5 ton RM5.0 is 6,800 kg. That weight decides your floor loading, your transport and often whether the machine can be used indoors at all.

It also means the tonnage on the side of the machine describes a condition you'll rarely work in. Once the boom extends and the load sits away from the base, both charts fall away quickly, and they don't fall at the same rate. That's what the rest of this page is about.

The capacity gap, radius by radius

Both figures below come from the two load charts in section 09, with outriggers at maximum extension. At each radius we've taken the shortest boom on each machine that reaches it, so the comparison isn't skewed by one machine running a much longer stick.

RM3.0 (3 ton) RM5.0 (5 ton) Extra load, 5 ton
1.0 m
3,000 kg
5,000 kg
+2,000
2.0 m
2,000 kg
3,000 kg
+1,000
3.0 m
1,800 kg
2,000 kg
+200
5.0 m
1,000 kg
2,200 kg
+1,200
6.0 m
600 kg
1,400 kg
+800
7.0 m
500 kg
1,200 kg
+700
8.0 m
300 kg
1,000 kg
+700
9.3 m3 ton limit
200 kg
900 kgat 9.0 m
+700

Rated loads at maximum outrigger extension, from the RM3.0 and RM5.0 load charts. The 5 ton's last bar is its 9.0 m figure because its chart doesn't list 9.3 m; its maximum radius is 14.8 m, against 9.3 m for the 3 ton.

Where the extra capacity stops paying

At a 3 m radius the 5 ton costs you 2.5 times the machine weight and buys 200 kg.

The 3 ton's 4.7 m boom is unusually efficient between 3 and 4 m: it holds 1,800 kg at 3.0 m and 1,200 kg at 3.5 m. That's the band where most installation, plant-room and structural work sits, and it's exactly where the 5 ton's advantage almost disappears.

Push past 5 m and the picture reverses. The 3 ton drops to 1,000 kg at 5 m and 500 kg at 7 m, while the 5 ton still holds 2,200 kg and 1,200 kg. So the 5 ton isn't a bigger 3 ton. It's a machine for a different job: bigger loads further out, and anything above 10 m of hook height.

Where the 5 ton earns its moneyLoads of 1.2 to 2.2 t at 5 to 7 m, lift heights from 10 to 16 m, and radii out to 14.8 m that the 3 ton simply can't reach.
Where it doesn'tWithin about 4 m, under roughly 1.8 t, and on any site where a 955 mm machine is already as wide as the access allows.

Why the gap narrows right at 3 metres

It looks like a mistake in the chart. It isn't, and the reason is worth understanding before you read any spider crane load chart.

At 3 m, the 3 ton is working on its 4.7 m boom, a stubby stick at a steep angle with very little of its length out past the slew ring. The 5 ton, to reach the same 3 m, is working on its 4.4 m boom, also short. Both are in their strongest configuration, so both hold a high proportion of their rating, and the difference between them shrinks to the difference between the two booms' structural ratings, not between the two nameplate numbers.

Extend either machine and the ratio changes. The 3 ton's capacity falls faster because it's a smaller structure working nearer its limit at every radius. By 5 m the 5 ton is holding more than twice what the 3 ton can.

One number that matters if you need height as well as load. On its 7 m boom, the 5 ton is rated 3,000 kg at a 3 m radius, because that longer boom reaches 3 m at a much steeper angle, and the chart allows more. So a 3 m radius with an 8 m hook height is a very different question from a 3 m radius at 2 m. Read the column for the boom length you need, never the best number on the page. Our guide to reading a spider crane load chart covers this in detail.

What the 5 ton actually buys you

01

Reach

14.8 m maximum radius against 9.3 m. Nearly six extra metres of working envelope, which is the difference between reaching the far side of a site from one setup and moving the crane twice.

02

Height

16 m of hook height against 10 m, on a boom that extends from 4.0 to 15.6 m in five sections. Above 10 m the 3 ton has nothing to offer at any capacity.

03

Load at distance

1,200 kg at 7 m where the 3 ton manages 500 kg. Once you're past 5 m, the 5 ton's advantage is real and roughly doubles each metre.

04

A faster winch

6 and 11 m/min hook speeds against 4.8 m/min, and two travel speeds up to 2 km/h against 0.8. On a high-volume site that shows up in the day rate.

What the extra tonnage costs you

Everything below is on your side of the ledger. This is where "extra capacity stops paying": not in the lift, but in what the machine demands before it can make one.

Specification RM3.0 (3 ton) RM5.0 (5 ton) Change
Machine weight 2,700 kg 6,800 kg +4,100 kg
Width, stowed 955 mm 1,400 mm +445 mm
Length, stowed 3,550 mm 4,650 mm +1,100 mm
Height, stowed 1,700 mm 2,160 mm +460 mm
Outrigger spread 4,470 × 3,940 mm 5,600 side × 5,560 front mm
5,000 rear
+1.1 m each way
Boom length, five sections 2.5 – 9.8 m 4.0 – 15.6 m +5.8 m at full
Max hook height, 4-rope 10.0 m 16.0 m +6.0 m
Slew, one full turn 45 s 120 s 2.7× slower
Engine options Changchai CZ380 16 kW / Yanmar 3TNV88 18.2 kW / battery Yunnei YN25GB 37 kW / Yanmar 4TNV88 27 kW bigger diesels

The slew speed deserves a second look. A full 360° takes 120 seconds on the 5 ton and 45 seconds on the 3 ton. On a site where you're slewing between the truck and the fixing point twenty times an hour, that's most of a minute per lift spent waiting.

The outrigger spread is the figure that kills most 5 ton plans. It needs 5.6 m of clear ground on the side and front, before you've allowed room for the load. Inside a building, in a courtyard, between plant, that space often isn't there. The 3 ton needs 4.47 m, which is still a lot, but it's a different category of site.

Doors and floors: where the 5 ton usually stops

Width is the first wall you hit. At 1,400 mm the RM5.0 is wider than any personnel door, and wider than most double doors. It needs a goods entrance or a vehicle opening, and that usually settles the question before capacity gets a vote.

900 mmstandard single door
RM3.0 · 955
RM5.0 · 1,400
RM3.055 mm too wide
RM5.0not a chance
1,200 mmwide internal opening
RM3.0 · 955
RM5.0 · 1,400
RM3.0122 mm each side
RM5.0200 mm too wide
1,800 mmgoods entrance
RM3.0 · 955
RM5.0 · 1,400
RM3.0422 mm each side
RM5.0200 mm each side

Top-down view, to scale within each row. Clear opening means the gap you can actually drive through with the door open, measured between the stops, not the leaf width.

Then the floor. Sick a machine onto four outrigger pads and the weight concentrates hard. Divide the machine weight plus the rated load across four pads and the difference is stark:

RM3.0, lifting 3,000 kg
≈1,425 kg

per outrigger pad, averaged

  • Machine2,700 kg
  • Load3,000 kg
  • Across 4 pads5,700 kg
RM5.0, lifting 5,000 kg
≈2,950 kg

per outrigger pad, averaged

  • Machine6,800 kg
  • Load5,000 kg
  • Across 4 pads11,800 kg

A crude average to show the scale of difference. Real distribution is uneven, rises as the load moves further from the slew centre, and concentrates on the pad nearest the load. Spreader plates help; they don't change the total. Get a structural engineer to sign off anything above a ground floor or on a suspended slab. Our guide to floor loading covers the calculation properly.

Three lifts, run through both charts

Count slings, shackles and any attachment as load. When your radius falls between two chart points, read the next larger radius. Weights are typical, so swap in your own.

LIFT 01

Machine skid into a plant room

  • Skid weight1,450 kg
  • Slings and shackles50 kg
  • At 3.0 m radius1,500 kg
RM3.083% of 1,800 kg RM5.075% of 2,000 kg

3 ton. Both machines do it. The 3 ton is 4,100 kg lighter, 445 mm narrower and slews nearly three times faster, which on an indoor plant-room job is the whole argument.

LIFT 02

Generator onto a raised plinth

  • Set weight1,940 kg
  • Spread beam and slings60 kg
  • At 5.0 m radius2,000 kg
RM3.0No · 1,000 kg rated RM5.091% of 2,200 kg

5 ton, and no other option. At 5 m the 3 ton is at half the required load. This is the band where the extra tonnage pays for itself in one job.

LIFT 03

Transformer onto a plinth

  • Unit weight3,420 kg
  • Slings80 kg
  • At 2.0 m radius3,500 kg
RM3.0No · 2,000 kg rated RM5.0No · 3,000 kg rated

Neither. At 2 m even the 5 ton's chart stops at 3,000 kg. This is where the ladder carries on: see the 8 ton.

Percentages are total load divided by the rated load at that radius from the shortest boom reaching it, outriggers fully extended. If the hook height you need forces a longer boom, read that column in section 09 instead. These are worked examples, not a lift plan.

Which one fits the job

The 3 ton suits you if

  • your loads sit within about 4 m and under roughly 1.8 t
  • the way in is a standard door or a 1,200 mm opening
  • you're working indoors, on a suspended floor, or in a plant room
  • you need 10 m of hook height or less
RM3.0 specs →

The 5 ton suits you if

  • you lift 1.2 to 2.2 t at 5 to 7 m from the crane
  • you need between 10 and 16 m of hook height
  • you're working outdoors or in an industrial bay with a goods entrance
  • you have 5.6 m of clear ground on two sides for the outriggers
RM5.0 specs →

Skip both if

  • you need more than 3,000 kg at 2 m, or more than 2,200 kg at 5 m
  • you need more than 16 m of hook height
  • the only access is a personnel door
  • the floor can't take 11,800 kg across four pads
Look at the 8 ton →
One more thing worth knowing before you choose by tonnage. If you can't fully extend the outriggers, none of the figures above apply, on either machine. The 5 ton is the one that suffers most here, because its chart assumes a 5.6 m spread that many sites can't give it. Ask for the reduced-span chart for your exact model, and never lift with an outrigger off the ground. More on outrigger set-up and ground pressure.

Coming from a smaller machine? The 1 ton vs 2 ton comparison covers the fit-out end of this range.

Full RM3.0 and RM5.0 load charts

Both at maximum outrigger extension on firm, level ground, reproduced column by column as published. The RM3.0 boom extends from 2.5 to 9.8 m and the RM5.0 from 4.0 to 15.6 m; the load charts below are printed against five fixed boom settings each, so read the column nearest to the boom you'll actually use.

RM3.0 (3 ton) load chart
Boom Radius Rated load
3.0 m 1.0 m 3.00 t
1.5 m 2.50 t
2.0 m 2.00 t
2.5 m 1.00 t
4.7 m 1.0 m 2.50 t
2.0 m 2.20 t
3.0 m 1.80 t
3.5 m 1.20 t
4.2 m 0.80 t
6.5 m 1.0 m 2.00 t
3.0 m 1.75 t
4.0 m 1.50 t
5.0 m 1.00 t
6.9 m 0.80 t
8.1 m 2.0 m 1.00 t
3.0 m 0.90 t
4.0 m 0.80 t
5.0 m 0.70 t
6.0 m 0.60 t
7.0 m 0.50 t
7.6 m 0.40 t
9.8 m 2.5 m 0.80 t
4.0 m 0.70 t
5.0 m 0.60 t
6.0 m 0.50 t
7.0 m 0.40 t
8.0 m 0.30 t
9.3 m 0.20 t
RM5.0 (5 ton) load chart
Boom Radius Rated load
4.4 m 1.0 m 5.00 t
2.0 m 3.00 t
3.0 m 2.00 t
3.6 m 1.50 t
7.0 m 1.0 m 4.00 t
3.0 m 3.00 t
5.0 m 2.20 t
6.0 m 1.40 t
6.5 m 1.20 t
9.8 m 1.5 m 2.50 t
3.0 m 2.10 t
5.0 m 1.70 t
7.0 m 1.20 t
8.0 m 1.00 t
9.0 m 0.90 t
9.2 m 0.80 t
12.6 m 2.0 m 1.00 t
4.0 m 0.95 t
6.0 m 0.85 t
7.5 m 0.75 t
9.0 m 0.65 t
11.0 m 0.55 t
12.0 m 0.50 t
15.6 m 2.5 m 0.80 t
4.5 m 0.75 t
7.0 m 0.65 t
9.5 m 0.55 t
11.5 m 0.45 t
13.0 m 0.35 t
14.8 m 0.30 t

FAQ

Is a 5 ton spider crane twice as strong as a 3 ton?

Only with the boom fully retracted, where it's 5,000 kg against 3,000 kg. At a 3 m radius the RM5.0 is rated 2,000 kg and the RM3.0 1,800 kg. From 5 m outward the gap widens again: 2,200 kg against 1,000 kg at 5 m, and 1,200 kg against 500 kg at 7 m.

Does "3 ton spider crane" mean the crane weighs 3 tons?

No. The tonnage class is the maximum lifting capacity with the boom fully retracted. The RM3.0 is rated 3,000 kg and weighs 2,700 kg; the RM5.0 is rated 5,000 kg and weighs 6,800 kg.

What can a 3 ton spider crane lift at 4 metres?

1,500 kg at 4.0 m on its 6.5 m boom, or 800 kg at 4.0 m on its 8.1 m boom, with outriggers fully extended. The boom you need for your hook height decides which figure applies.

Will a 5 ton spider crane fit through a doorway?

Not a standard one. At 1,400 mm wide with the boom stowed, the RM5.0 needs a goods entrance or vehicle opening. A 1,200 mm opening still leaves it 200 mm too wide. The 3 ton at 955 mm fits a 1,200 mm opening.

How much clearance do the outriggers need?

The RM5.0 spreads to 5,600 mm on the side and 5,560 mm at the front, so it needs 5.6 m of clear ground on two sides before you allow room for the load. The RM3.0 spreads to 4,470 × 3,940 mm.

How much weight does each outrigger pad carry?

As a rough average, machine plus rated load divided by four: about 1,425 kg per pad for a 3 ton lifting 3,000 kg, and about 2,950 kg per pad for a 5 ton lifting 5,000 kg. Real distribution is uneven and concentrates near the load. Get engineering sign-off for suspended floors.

Send us the radius, and the height

Load weight, working radius, hook height, the narrowest opening on the route, and whether the floor is suspended. With those five we can tell you which machine fits, and when the honest answer is that you need the next size up.

Method and sources. Load charts and specifications for the RM3.0 and RM5.0 come from Risenmega's 2026 spider crane catalogue and product pages. Charts are rated at maximum outrigger extension on firm, level ground. Radius comparisons use the shortest boom on each machine that reaches each radius, so neither machine is shown on a longer boom than its rival at the same distance. Floor-load figures are arithmetic averages for illustration, not a structural assessment. Worked examples use typical weights and are not a lift plan. See also Chinese spider crane brands compared.