✅ CE Certified | EN 280 EN ISO 3691-1 Compliant | Full Documentation. Learn more

🚢 FOB · CIF · DDP Door-to-Door — Worldwide Shipping from Qingdao Port. Learn more

📦 Consolidate Multiple Products in One Container — Save 30% on Freight. Learn more

Procurement Requirements

China Machinery Sourcing, Container Consolidation & Export Documentation Support

Shipping Policy

Risenmega Shipping Method

Welcome to Risenmega! We specialize in providing high-quality material handling and engineering machinery. Our shipping policy ensures smooth delivery and exceptional service to meet your needs.


Shipping Methods and Details

Shipping Methods Delivery Cycle Packaging Transit Time Origin Ports
EXW, FOB, CFA, CIF, DDP, DDU Non-customized products: Shipped within 72 hours
Customized products: Typically 15-20 days
Wooden boxes with fork pallets, cardboard boxes, metal cabinets, iron cabinets Approximately 45 days to the designated port Qingdao, Ningbo, Shanghai, Shenzhen, Guangzhou

Additional Information

  • Reliable Shipping: All goods are shipped via certified shipping companies to ensure secure and timely delivery.
  • Comprehensive Documentation: Each shipment includes a complete set of customs documents such as invoices, packing lists, and bills of lading, along with CE compliance reports required by customs authorities.
  • Peace of Mind: With our professional logistics solutions, you can rest assured that your order will reach you seamlessly.

For any questions regarding shipping, feel free to contact our customer service team. Thank you for choosing Risenmega!

Ship Multiple Machines in One Container from China

we consolidate everything into a single shipment with one set of export documents. Less freight cost. Less paperwork. One contact.

Buying from Multiple Chinese Suppliers? Here's What That Really Costs You.

There's a simpler way.

💸 3× the Freight Bills

Each factory ships separately. You pay full container minimums for each order — even when none of them fills a container.

📄 3× the Paperwork

Separate commercial invoices, packing lists, and certificates from every supplier. Your customs broker bills you for every file.

📞 3× the Communication

Three factories, three payment schedules, three production timelines to track — and if one delays, your whole shipment is held.

How Risenmega Container Consolidation Works

Send us your list of required machines —
model, quantity, and any configuration requirements. We'll source from our own stock and factory partners.
⏱ We respond within 24 hours with a sourcing plan.

We coordinate production or stock pickup from multiple factories, bring everything to our warehouse in Qingdao, and inspect each machine before loading.
📍 Single collection point — no chasing multiple factories.

All machines are loaded into one container.
We prepare the full documentation package: commercial invoice, packing list, CE certificates, Bill of Lading, and Certificate of Origin — all in one file.
📋 One customs declaration. One freight bill.

We book freight on your preferred terms:
FOB Qingdao / CIF destination port / DDP door delivery. You track one shipment, not three.
🚢 Average transit: 25–35 days to North Europe.

What Can We Consolidate in One Container?

🏭 Warehouse Operator Package

1× Electric Forklift (3T)
2× Electric Stackers (1.5T)
1× Hydraulic Dock Ramp
→ Fits in one 40HQ container
→ Saves approx. €1,200–1,800 vs separate shipping

🏗️ Construction Dealer Package

2× Self-Propelled Scissor Lifts (12M)
1× Mini Excavator (1.5T)
1× Spider Crane (3T)
→ Fits in one 40HQ container
→ One CE package, one customs entry

🪟 Glass Installation Package

1× Scissor Lift (10M)
2× Vacuum Glass Lifters (RM-HO Series)
1× Glass Lifter Trolley
→ Compact load — possible in 20GP
→ Single shipment, coordinated lead time

Documentation Package

One Shipment. One Complete Documentation Package

Every consolidated shipment comes with a complete
export documentation package prepared by our team.
Your customs broker receives everything in one folder:

✅ Commercial Invoice (combined, all products)
✅ Packing List (itemised by machine)
✅ Bill of Lading (single B/L for the full container)
✅ Certificate of Origin (Form A or CO as required)
✅ CE Certificates (for all applicable products)
✅ Product Manuals & Technical Specifications
✅ Inspection Photos (pre-shipment, before loading)

On request:
○ SGS / BV Third-Party Inspection Report
○ FORM E (for ASEAN trade preference, if applicable)
○ Additional certificates as required by your customs

Frequently Asked Questions

Get answers to your questions about our products and services.

Q1: Can I mix machines from different categories in one container?

Yes. We regularly consolidate different machine types —
for example, forklifts, scissor lifts, and vacuum lifters —
into a single container from our Qingdao warehouse. Each machine is documented separately within the combined export package.

Q2: What is the minimum order for container consolidation?

There is no fixed minimum. We work with orders that fill anything from a 20GP to a 40HQ container. For very small orders, we can advise whether LCL (Less than Container Load) shipping might be more cost-effective.

Q3: How long does consolidation take?

It depends on the production lead time of each machine. Typical timelines: stock items 7–15 days to warehouse; made-to-order items 20–35 days. We coordinate production schedules to minimise total waiting time.

Q4: Do all machines in the container get one CE certificate?

No — CE certification is per machine, not per container. Each eligible machine has its own CE certificate included in the documentation package.

Q5: Can you store machines in your warehouse if production times differ?

Yes. If one machine is ready earlier than another, we can hold it in our Qingdao warehouse at no additional charge for up to 30 days while awaiting the remaining items.